Babaamaajimowinan (Telling of news in different places)
Sorted by date Results 1 - 5 of 5
CSAH 5 approximately 1.6 miles north of Solway is now open for traffic. Construction crews may be still doing finish work in that area. Please use caution in and around all construction zones. For more information, please contact the Beltrami County Highway Department at 333-8173....
The construction project on County State Aid Highway 33, Mission Road NE, will begin paving operations starting Monday, September 28th. The paving is expected to take about a week to complete, weather permitting. A pilot car will be in place to guide motorists through the construction zone. Please use the detour already in place to avoid this area if possible. If you must travel in the construction area expect significant delays and use caution. For more information regarding this closure please contact the Beltrami County Highway Department...
Construction Begins on Co Hwy 23 (Gull Lake Loop Road) from US HWY 71 at Turtle River to Co Hwy 29 on the north side of Gull Lake. Resurfacing of Co Hwy 23, Gull Lake Loop Rd NW, will commence on TUESDAY JULY 14, 2015. Motorists can expect delays at times. There is no detour for this work. Traffic Control will be in place. Beltrami County Highway Department urges motorists to use caution when traveling in and around all work zones and whenever possible, to please find an alternative route. For more information regarding this project please...
FROM THE BELTRAMI COUNTY HWY DEPT Maintenance for the Bridge located on Lake Ave., crossing the Mississippi River, will begin Monday June 17, as part of a Bituminous Surfacing project from 1st Street to Lakeside Drive (2.5 miles). The contractor will be installing portable signal lights at the bridge and traffic will be restricted to one lane only. The work on the bridge will last about 3 weeks, while the remaining bituminous work is planned to be completed by September, weather permitting. Motorists are urged to find alternate routes when...
Construction Begins on Co Rd 301 (Puposky Road NW) from Irvine Ave N (Co Rd 15) to Great Divide Rd NW (Co Rd 26) Construction will begin on Monday May 20, 2013. The contractor will begin construction for grading and aggregate surfacing, construction will continue through most of the summer. The road will be closed, except for local traffic only. The county urges motorists to find alternate routes to avoid delays. Construction Resumes on Co Rd 39 (Scenic Hwy SE) from Birchmont Beach Rd SE (Co Rd 20) to Turtle River Lk Rd SE (Co Rd 22). Construct...